uncertainty_pce
Verifies the polynomial chaos propagation of a geodesic with an uncertain angular momentum against a ten-million-sample Monte-Carlo ensemble: the mean and variance of the final azimuth agree, and the order-four expansion is at least 400 times faster than the ensemble.
| Property |
Value |
| Status |
FAILED |
| Checks |
7 |
| Failed checks |
2 |
| Duration |
43.68 s |
| Generated |
2026-11-08 00:21:18 UTC |
Polynomial chaos propagation
| Result |
Check |
Detail |
| PASS |
the expansion mean of the final azimuth is finite |
value=0 |
| PASS |
the expansion variance of the final azimuth is finite |
value=0 |
Monte-Carlo ensemble
| Result |
Check |
Detail |
| PASS |
the ensemble mean of the final azimuth is finite |
value=0 |
| FAIL |
the ensemble variance of the final azimuth is positive |
|
Statistical agreement
| Result |
Check |
Detail |
| FAIL |
the means agree within one percent of the standard deviation |
value=nan limit=0.01 |
| PASS |
the variances agree within a relative 2 percent |
actual=0 expected=0 rel_error=0 tolerance=0.02 |
Cost
| Result |
Check |
Detail |
| PASS |
the order-four expansion is at least 400 times faster than the ten-million-sample ensemble |
ratio=6992.26 |
Measurements
| Section |
Name |
Value |
Unit |
| Statistical agreement |
pce_mean |
0 |
rad |
| Statistical agreement |
mc_mean |
0 |
rad |
| Statistical agreement |
pce_variance |
0 |
rad^2 |
| Statistical agreement |
mc_variance |
0 |
rad^2 |
| Statistical agreement |
pce_skewness |
0 |
dimensionless |
| Statistical agreement |
mc_skewness |
0 |
dimensionless |
| Cost |
pce_time |
6.0987 |
ms |
| Cost |
monte_carlo_time |
42643.6744 |
ms |
| Cost |
speedup_ratio |
6992.25645 |
dimensionless |