cluster_scheduler_stealing
Validates capacity-weighted tile partitioning conservation, dynamic load balancing convergence, speculative work stealing on deadlines, and thread-safe scheduler node transitions.
| Property |
Value |
| Status |
PASSED |
| Checks |
49 |
| Failed checks |
0 |
| Duration |
0.1164 s |
| Generated |
2026-11-07 18:14:28 UTC |
Tile Partition Conservation Across Resolutions
| Result |
Check |
Detail |
| PASS |
scheduler begins frame successfully |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
sum of node tile quotas exactly equals total active tiles |
|
| PASS |
initial remaining tiles equals total |
|
| PASS |
scheduler begins frame successfully |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
sum of node tile quotas exactly equals total active tiles |
|
| PASS |
initial remaining tiles equals total |
|
| PASS |
scheduler begins frame successfully |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
sum of node tile quotas exactly equals total active tiles |
|
| PASS |
initial remaining tiles equals total |
|
| PASS |
scheduler begins frame successfully |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
slot tile assignment matches allocated quota |
|
| PASS |
sum of node tile quotas exactly equals total active tiles |
|
| PASS |
initial remaining tiles equals total |
|
Capacity Share Convergence & Latency Dampening
| Result |
Check |
Detail |
| PASS |
capacity shares compute successfully |
|
| PASS |
capacity shares are strictly normalized to 1.0 |
actual=1 expected=1 abs_error=0 tolerance=1e-12 |
| PASS |
node 0 capacity share matches analytical formulation |
actual=0.750469043152 expected=0.750469043152 rel_error=0 tolerance=1e-10 |
| PASS |
node 1 capacity share matches analytical formulation |
actual=0.240150093809 expected=0.240150093809 rel_error=0 tolerance=1e-10 |
| PASS |
node 2 capacity share matches analytical formulation |
actual=0.0093808630394 expected=0.0093808630394 rel_error=0 tolerance=1e-10 |
Deadline Timeout Reclamation & Work Stealing
| Result |
Check |
Detail |
| PASS |
Scheduler initializes frame with remote and local nodes |
|
| PASS |
remote slot receives non-empty tile quota |
|
| PASS |
mark dispatched succeeds for remote tile |
|
| PASS |
tile status is InFlight after dispatch |
|
| PASS |
no tiles reclaimed prior to deadline expiration |
|
| PASS |
stalled tile successfully reclaimed after deadline expiration |
|
| PASS |
reclaimed tile index matches target |
|
| PASS |
reclaim reason is Timeout |
|
| PASS |
tile status transitioned to Reclaimed |
|
| PASS |
reclaimed tile qualified for immediate local execution |
|
| PASS |
local completion of stolen tile succeeds |
|
| PASS |
tile status is CompletedLocal |
|
| PASS |
late remote response ignored without double count |
|
| PASS |
late discard telemetry incremented |
|
Concurrent Peer Registry Access
| Result |
Check |
Detail |
| PASS |
no registration failures under concurrent multi-threaded stress |
|
| PASS |
all nodes cleaned up symmetrically |
|